Pay in 4 interest-free payments of $7.86 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 18 - Aug 23
Pay in 4 interest-free payments of $7.86 Learn more
Ships within 48 hours · Estimated delivery Aug 18 - Aug 23
in correct locations
Motor output = 1A continuous
the MPVs were introduced to replace the ageing fleet of departmental vehicles
One of British Rail’s Pilot Scheme designs
2P-009-401 MK3 Loco Hauled Virgin Trains Standard 12118 Carriages-Coaches in correct locationsMk3 Locomotive Hauled Coaches The British Rail Mk 3 coach was developed primarily for the Class 43 HST, but incorporated design features to enable it to be hauled by conventional locomotives. The first coach entered service in 1975 and the last were made in 1988. Most Mk. 3 coaches built are still in service today, including the Royal Train. Specifications Highly detailed Body, underframe and bogies Light bar ready NEM Coupling Finely applied livery
US$ 50.00
US$ 114.00
US$ 88.00
US$ 162.00
US$ 156.00
US$ 312.00
US$ 147.00